Department of Civil, Construction, and Environmental Engineering

Spring 2005 

CE 483/583 – Bridge Design

FINALS WEEK MEETING WED 4 pm APPERSON 212

Latest Moment Curvature Spreadsheet 6/7/05

Text: No required texts

1)  AASHTO LRFD Bridge Design Specifications available for check-out from CE main office.

2) ACI 318-02 Building Code and Commentary, American Concrete Institute, Farmington Hills, MI

 


HW#2: Railing and curb details

 

Professor

Dr. Christopher Higgins, PE

Office

Apperson 305

Telephone

(541) 737-8869

E-mail

chris.higgins@oregonstate.edu

Office Hours

Tues. and Thurs. 12:30 PM -1:30 PM and by appointment

Teaching Assistant

Ae-young Lee

Office

Apperson 309

Telephone

 

E-mail

leeae@onid.orst.edu

Office Hours

 

 

Home Work Solutions On-Line (will appear after due date)

HW#1 Design shear and moments (due 4/28/05)

HW#2 Bridge case study part 1 and Strip widths (due 5/ 13 and 17/05)

HW#3 Bridge Deck and Overhang Design (due 5/19/05)

HW#3b Final Design Moment and Shear Envelopes

HW#4 Bridge load distribution (due 5/24/05)

HW #5 Bridge Main Girder Re-Design and Shear Analysis of existing bridge at d and 2d from support (due 6/1/05)

HW#6 Shear Design

Final Report: Development lengths, design drawings for bridge redesign

 

 

FINAL EXAM  Location: None. Project is Final Exam